Build sub structure blockwork and fit intello membrane to internal face of sheepswool framing to external walls. Fix tapes to membrane to be plastered into party walls. Prime floor joists to tape air-tight tape to seal to wall membrane.
First floor ceiling membrane with mesh tape to plaster into walls
Continuous wall and ceiling membrane with mesh to plastered walls
Floor joists primed and taped and sealed to membrane
Sub-structure blockwork to rear extension