Cut back floorboards to first floor to allow air-tight membrane to be taken down the entire face of the external wall, and allow access patch plaster detail continuously between floors.

Fit lintel to lounge window and divert water service.
First floor floorboards cut back for insulation & airtightness detail
New lintel to replace rotted away timber lintel
Diversion of water supply below re-built rear extension