Monday, 27 September 2010

Retrofit Works Starts on Site!

The building contract has been signed, and the contractor has now taken possession of the house at St Lukes St, and will start the demolition of the existing rear extension that houses the bathroom, and begin the stripping out works.

The new 'Ecopassiv' triple-glazed windows have been ordered, as they have a long lead-in period as they are currently manufactured in Poland for the UK supplier, The Green Building Store. It is hoped that projects such as this retrofit will stimulate UK manufacturing of high-quality triple-glazed windows.

Anne Thorne Architect's have issued the final set of construction detailed drawings and specification.