The new 'Ecopassiv' triple-glazed windows have been ordered, as they have a long lead-in period as they are currently manufactured in Poland for the UK supplier, The Green Building Store. It is hoped that projects such as this retrofit will stimulate UK manufacturing of high-quality triple-glazed windows.
Anne Thorne Architect's have issued the final set of construction detailed drawings and specification.